Demo Kitchen

Day one of kitchen went well, as there isn’t any technical work that needs to be done besides removing old material. The key thing here is to make sure “saved” materials are set aside and the site is kept clean for the client. Material costs are through the roof due to Covid, so alot of the old framing, cabinets, etc. is saved for future projects.

processed_20210412_144131.jpg
processed_20210413_081041.jpg
processed_20210413_081047.jpg
processed_20210413_081049.jpg
processed_20210413_081036.jpg
Luc Neesby